Monday, 22 April 2013

Final Introductory Animation


Here's the final animation produced by David and myself:

http://youtu.be/nWbj6euKQGY

We're really happy with the results!

Monday, 15 April 2013

Targets for Monday 15th April 2013


World- other websites

Floating quotes
Fish- other groups work (screen shot)
Book- complete journey
1-    Paragraph
2-    2 paragraph
picture frame- lindas photos
 Liam
Screen shots groups work
Backboard photos
The changes and animation interactive.
 

Jaz
Other websites
Paragraph
quote
 
David
fix up story board
Rabbit hole
Presentation

Meeting 13



Meeting held on: Friday 12th April
Location: Skype
Attendance: JK (Project Manager) LH (Team Member) DW (Team Member)
Apologies: None


No.
Raised by
Item

Action by
1
JK
Greetings
Greeting and Apologies for not attending on Monday
JK
2
JK
Progress
Checking were we are all at the point we need to be
ALL
3
LH
Targets
 LH explains that he is on target and needs to finish coding some interactive for Monday
ALL
4
DW
Targets
Has to amend final touches on the rabbit hole for Monday to give to LH
ALL
5
JK
Meeting
Next meeting to be held on Monday 15th April
ALL


Meeting 12



Meeting held on: Monday 8th April 2013
Location: Cantor 9200
Attendance: JK (Project Manager) LH (Team Member) DW (Team Member)
Apologies: JK’s Absence, LH postponing the meeting.


No.
Raised by
Item

Action by
1
LH
Present
LH presented his work (Introductory animation) to DW. LH received positive feedback from DW.
DW LH
2
DW
Present
DW presented CGI work. It was also met with positive feedback yet constructive comments from LH were given.
DW LH
3
TUTOR

Critique
Ken gave feedback on current work. LH was told to ad a vignette to the animation and DW was told to alter the font choice for the CGI section
DW LH
4
LH DW
Improve work
DW and LH improved their work based on each others comments and the tutor.
All
5
JK
Meeting
Next meeting will be held on Friday 12th April 2013 for JK to catch up on missed events.
All


Monday, 8 April 2013

Animation Improvements

After a visit from our client, a few issues within the animation were spotted. This included rather simple mistakes such as spelling and grammatical issues. They were soon rectified. Two improvements, from our lecturer, were also suggested. One suggestion was that I should add a vignette to the piece to add visual depth, this was soon applied:

I think this has definitely improve the look of the piece and help create the cutout, handmade look.

Another suggestion was that the font from the 3D 'Rabbit Hole' section also should be changed to suit the fonts in the 2D section. I have given David the fonts and he should be changing it accordingly.

Revised 'Map' for Interactive Experience


Friday, 5 April 2013

Animation Progress



The animation is almost complete. Traditional techniques were replicated using digital software, such as Adobe Flash, Photoshop and Premiere, to create the animation’s chosen design style in a short time period to a high standard. It was very important to create the piece to meet the expectations of the client in the time frame provided. Both hand drawn animation and computer ‘tweened’ animation are being used to produce the animation. I am very happy with the outcome yet it has taken longer than expected. However the animation will still be completed in plenty of time for myself to be able to animate and code the interactive section.